Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Feb 2016 - May 2016 |
Australian Government Contribution: | $249,499 |
Local Council/Shire: | Pittwater Council |
State: | NSW |
Project DescriptionInadequate road width and drainage on Collector Road resulting in pedestrian and traffic safety issues as well as minor local flooding of properties.
Construction of road pavement over a length of 330 metres on the southern side of the road to create a 7.5 metre carriageway. Work includes kerb and gutter, road pavement, drainage works and regrading of the nature strip (including adjustment to multiple driveways).
Total cost of proposed project is $389,808 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016