Jump to Content

Irrubel Road Newport - 054850-14NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - May 2016
Australian Government Contribution:$249,499
Local Council/Shire:Pittwater Council
State:NSW

Project Description

Inadequate road width and drainage on Collector Road resulting in pedestrian and traffic safety issues as well as minor local flooding of properties.

Construction of road pavement over a length of 330 metres on the southern side of the road to create a 7.5 metre carriageway. Work includes kerb and gutter, road pavement, drainage works and regrading of the nature strip (including adjustment to multiple driveways).

Total cost of proposed project is $389,808

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016