First Street, Mudgee - 054947-14NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2015 - Jun 2015
Australian Government Contribution:$23,816
Local Council/Shire:Mid-Western Regional Council
State:NSW

Project Description

The pavement is in very poor condition, significantly out of shape and has numerous pavement failures resulting in shoves and potholes. Poor drainage results in water flowing across the road and water ponding for long periods of time on the road resulting in these failures.

It is proposed to rehabilitate the road pavement by overlaying the existing pavement material. It is proposed to rectify the drainage issues by reshaping the road, and constructing a short length of kerb and gutter to direct the water and prevent the water from crossing the road.

Total cost of proposed project is $28,153

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.