Jump to Content

Cobaki Road (Rural road.) - 055011-14NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2015 - Sep 2015
Australian Government Contribution:$912,649
Local Council/Shire:Tweed Shire Council
State:NSW

Project Description

At 3.92 and 4.05 km there are two low level culvert/causeways that are very flood-prone, in poor structural condition, and only one lane wide. As this is a no-through road, residents beyond the culverts have their only road access frequently blocked by storm flows. The eastern culvert presents a barrier to fish passage in the stream. The flow of water is bypassing the culverts indicating that the structure has been undermined.

Replace the two culverts with two small concrete bridges that provide for two traffic lanes. The bridges will be at a higher level thus reducing flood frequency. The barrier to fish passage will be removed. The road approaches to the two new bridges will be made good to suit the new structures.

Total cost of proposed project is $962,650

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016