Jump to Content

Campbell Street, RIVERVALE - 055063-14WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2015 - Mar 2015
Australian Government Contribution:$198,092
Local Council/Shire:City of Belmont
State:WA

Project Description

Asphalt wearing course deformation and cracking. Damaged kerbing along both side of the street and old drainage pits not up to standard blocking easily and reducing storm water capture.

Length, width and area of job: 170m x 9m = 1,530m2. A combination of reconstruction and overlay to be used on two sections of the road after the drainage has been upgraded and the damaged sections of kerb replaced.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016