Menzies Street, RIVERVALE - 055064-14WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2015 - May 2015
Australian Government Contribution:$74,369
Local Council/Shire:City of Belmont
State:WA

Project Description

Age, cracking and deterioration of asphalt wearing course allowing water to penetrate into the base course materials below. Drainage upgrades to existing structures.

Length, width and area of job: 293m x 6.6m = 1,933m2. Full length of the road to have the existing asphalt surface milled away from the kerbing by up to 1m and then a new asphalt wearing course applied as an overlay. Upgrade existing drainage structures to match the new asphalt finished level.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016