Old Geraldton Road (Rural Road) - 055080-14WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Oct 2016
Australian Government Contribution:$320,908
Local Council/Shire:Shire of Moora
State:WA

Project Description

Existing road is gravel which becomes slippery in winter and dusty in summer causing traffic hazards. It is a school bus and a heavy haulage route.

Reconstruct existing gravel surface and apply a 7.0 metre wide two coat bitumen seal with 1.5 metre wide gravel shoulders.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017