Bruce Highway – Arnot Creek Bridge

Funding Program:Investment Road and Rail Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mid 2016 - Early 2017
Estimated Project Cost:$10,000,000
Australian Government Contribution:$8,000,000
Local Council/Shire:Cassowary Coast Regional Council
State:QLD
Corridor:Brisbane - Cairns

Project Description

The project involves the replacement of an existing single-span deteriorated bridge with a new single-span concrete bridge. The scope of the project comprises:

  • Replace both super-structure and sub-structure at the existing 19.95 metre long single-span concrete bridge with a 25 metre long single-span concrete bridge at approximately existing level;
  • Approximately 380 metres of pavement transition at approach roads either side; and
  • Construction of a temporary side track to provide traffic with continued highway access during the construction phase.

Benefits

The works will provide travel time savings for freight and passenger vehicles.  Freight and passenger connectivity will be maintained on the Bruce Highway, along with a safe and sustainable access to the tranposrt network.

Funding

The Australian Government has committed up to $8 million towards the project, in partnership with the Queensland Government.

Timetable

Construction commenced on 30 May 2016 and was completed 22 February 2017.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 7/05/2017