Expected Start/Finish:May 2015 - Jun 2015
Australian Government Contribution:$34,085
Local Council/Shire:Mosman Municipal Council
State:NSW

Project Description

Along concrete pavement length there is severe transverse and block cracking. The cracking has formed individual sections in the pavement which act as separate units under vehicular loading. There are deep holes and heavy patches on site which have failed thereby allowing water to seep into the sub-surface pavement structure. Exposed reinforcement have also been observed on site which may deteriorate with time causing hazard for pedestrian and vehicular traffic.

Saw cut and construct 200mm thick two-way reinforced concrete

Total cost of proposed project is $73,956

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.