Department of Infrastructure and Regional Development print logo Building our Future print logo

Oodnadatta Track (Marla - Marree Road, Rural Road) - 055547-14SA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Jun 2017
Australian Government Contribution:$3,370,394
State:SA

Project Description

The targeted section of road is low lying and requires forming and sheeting to get above natural surface level. The existing road material is marginal and turns to bulldust in summer and becomes very slippery after moderate rainfall.

The work will involve forming and sheeting of targeted sections with crushed rocks. Sheeting will be 150mm – 200mm in depth with 23m formation having a carriageway width of 9 metres and table drains on each side of the road.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017