Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Kuchel Road, Murray Bridge - 055573-14SA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Sep 2015 - Nov 2015
Australian Government Contribution:$186,996
Local Council/Shire:Rural City of Murray Bridge
State:SA

Project Description

Kuchel Road acts a s a link between Murray Bridge and Mypolonga and services small settlements such as Toora. Kuchel Road also provids access to significant infrastructure sites including the Trility Water Treatment Plant and the SA Water Pump Station that feeds the Murray Bridge to Adelaide supply main. The pavement on Kuchel Road has reached the end of its useful life. It have become very rough through the continual repair of potholes. Pavement widths are narrow (less than 6m) and significant edge drops and breakout are evident due to poor roadside drainage. Kuchel Road also acts as a bus route.

Full pavement reconstruction of 1025m of Kuchel Road with a formation width of 8.0m and seal width of 7.0m to complete the link between Murray Bridge and Mypolonga Reconstruction of existing culvert/floodway (Ch865) to increase capacity and reduce times water floods across road. Improved linemarking and signage.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/04/2016