Idaville Road, Merriwa - 055668-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2015 - Sep 2015
Australian Government Contribution:$205,655
Local Council/Shire:Upper Hunter Shire Council
State:NSW

Project Description

Deteriorated failed pavement and timber culvert failure.

Pavement widening and gravel overlay of approx. 0.400km to new formation width. Demolish old bridge and replace with single cell 900mm dia pipe culvert, achieve a 4:1 batter both upstream and downstream and cast insitu headwall. Cut and clean shoulders and verges. Primer seal of new gravel pavement. Length of road to be upgraded 0.400km x 8 metres wide with a 6 metre bitumen seal, total area 4000m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2016