Elcombe Road (Rural Road) - 055675-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Jun 2016
Australian Government Contribution:$764,031
Local Council/Shire:Gwydir Shire Council
State:NSW

Project Description

Existing bitumen road surface has become fatigued due to traffic and the age of the pavement with the surface having numerous potholes and deformations and some areas of inadequate geometric alignment.

Strengthen the road pavement with a 150mm base overlay, widen the trafficable width and correct geometric alignment plus apply two coat bitumen seal and line marking. This will provide a stronger pavement, smooth surface and correct geometric alignment.

Total cost of proposed project is $787,795

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.