Lancelot Drive, Daw Park - 055791-15SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - May 2016
Australian Government Contribution:$260,110
Local Council/Shire:City of Mitcham
State:SA

Project Description

The kerb and water table on both sides of Lancelot Drive are in very poor condition with displacement vertically and horizontally. The seal texture is poor with a significant number of edge breaks against the kerb. The road pavement is in reasonable condition with only minor areas of failure. Lancelot Drive is classified as a “Local” road with a vehicle traffic volume of 200 vehicles per day.

It is proposed to replace all of the kerbing on both sides of Lancelot Drive. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a 80mm Asphalt pavement followed with 30mm Asphalt seal.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016