Norman Street, St. Marys - 055856-15SA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Jun 2017
Australian Government Contribution:$461,789
Local Council/Shire:City of Mitcham
State:SA

Project Description

The kerb and water table on both sides of Norman Street are in very poor condition. The kerbing is displaced both vertically and horizontally due to soil movement and tree growth.. The road pavement is significantly deformed due to the reactive sub-grades in the area. Norman Street is 540 meters in length and classified as a “Local” road with a vehicle traffic volume of 400 vehicles per day.

It is proposed to replace all of the kerbing on both sides of Norman Street. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a 70mm Asphalt pavement followed with 30mm Asphalt seal.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.