Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Jun 2016
Australian Government Contribution:$28,616
Local Council/Shire:City of Mitcham
State:SA

Project Description

The kerb and water table on both sides of Norman Court are in very poor condition. The kerbing is displaced both vertically and horizontally due to soil movement and tree growth.. The road pavement is significantly deformed due to the reactive sub-grades in the area. Norman Court is 50 meters in length and classified as a “Local” road with a vehicle traffic volume of 50 vehicles per day

It is proposed to replace all of the kerbing on both sides of Norman Court. The kerb replacement will be followed by the removal of the road seal and pavement. The road will be replaced with a 100mm Asphalt pavement followed with 40mm Asphalt seal. The work in Norman Court will complement the work proposed in Norman Street.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.