Plaza Parade - 056097-15QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2015 - Apr 2016
Australian Government Contribution:$538,005
Local Council/Shire:Sunshine Coast Regional Council
State:QLD

Project Description

The proposed section has the following defects: major ravelling, oxidation and weathering of the asphalt surface, some minor cracking in small isolated areas. The surface of the road has moderate failures (for example, potholes and patches).

Asphalt Resurfacing: Profile edges to key-in with the concrete kerb and channel; Waterproofing and crack alleviation bitumen sprayed seal; and 50mm thick Dense Graded Asphalt Overlay (using 14mm nominal size aggregate).

Total cost of proposed project is $602,017

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016