Driftway Road (rural road) - 056187-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2016 - Jun 2016
Australian Government Contribution:$81,985
Local Council/Shire:Weddin Shire Council
State:NSW

Project Description

This section of Driftway Road consists of only a 4.8m wide bituminous surface. Currently vehicles have to drop atleast one wheel off the pavement onto the batter and table drain to pass in this narrow section. This puts strains on the edge of the pavement which requires constant repairs and reduces safety to traffic especially to the heavy vehicles including school buses.

It is intended to widen the road formation to 8m with a 7m wide bitumen seal and a 0.5 metre unsealed shoulder on both sides. This project will include erecting & removing traffic control at the site, removing & reinstating signs & guideposts, clearing, excavation, adding gravel, widening the pavement, reconstructing the table drains, shaping, compacting, trimming and primersealing incorporating 10mm aggregates with a 5mm scatter coat.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.