Department of Infrastructure and Regional Development print logo Building our Future print logo

Potter Street - 056208-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Oct 2015
Australian Government Contribution:$48,553
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

The existing surface is very old and rough. Some potholes and other surface defects have developed. There are a lot of loose aggregate on the surface due to ravelling of old surface.

The proposed work includes resurfacing of the road with asphalt. Length = 215 m; Width = 8.2 m; Area = 1763 m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2016