Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Buckleys Road - 056214-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Jan 2016
Australian Government Contribution:$160,133
Local Council/Shire:Parramatta City Council

Project Description

The road surface is affected by pavement failures and cracks. The surface is old and rough due to multiple patches and disintegration of existing asphalt surface.

The proposed work includes repair of kerb and gutters, repair of pavement failures and resurfacing of the road with asphalt. Length = 315 m; Width = 8.2 m; Area = 2583 m2.

Total cost of proposed project is $177,701

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/07/2016