Perup Road (rural road) - 056265-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2015 - Jul 2017
Australian Government Contribution:$100,000
Local Council/Shire:Shire of Manjimup
State:WA

Project Description

The existing road width of 4.0 metres is substandard. The existing vertical and horizontal geometry are substandard.

Design and construct road with compliant horizontal and vertical geometry with a 6 metre wide sealed pavement and 1 metre wide shoulder each side. Extend and or replace existing culverts as appropriate.

Total cost of proposed project is $435,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.