Project Description

Road pavement has failed due to poor subgrade and has become a hazard to road users and the general public. There is also poor drainage within this section of road that needs to be rectified.

It is proposed to dig out 430 millimetres of existing road pavement and import 300 millimetres of Class 3 and 100 millimetres of Class 2 crushed rock, then add a 30 millimetres Type N asphalt. Replace all existing kerb and channel, pits and underground pipe infrastructure.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.