Yorkrakine Road, Tammin - 056910-15WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Apr 2016
Australian Government Contribution:$316,017
Local Council/Shire:Shire of Tammin
State:WA

Project Description

Bitumen road width currently at 3.9 metres with 1.5 metre gravel shoulders at either side. Bitumen seal has deteriorated and heavily potholed, the gravel shoulders are of poor quality gravel and becomes slippery and unsafe when wet, the culvert at chainage 2.77 needs to be renewed and widened, vegetation needs to be cleared either side of the road.

Clear vegetation either side of road including the removal of 20 large trees. Form V drains. Renew storm water culverts and install headwalls. New base gravel on shoulders to 10 metre width formation. 125mm gravel base overlay on existing pavement and shoulders. stabilise and compact to line and level. 14/7mm bitumen aggregate seal. Install new signage and guide posts.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016