Elah Road (Rural Road) - 056930-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:May 2016 - Sep 2017
Australian Government Contribution:$344,016
Local Council/Shire:Warrumbungle Shire Council

Project Description

The existing timber 15 metre long bridge structure has reached the end of its useful life and is no longer able to carry heavy loads.

Replace the timber bridge structure with a 10 metre long concrete box culvert structure. The works will include construction of a sidetrack and road approaches to the new bridge structure.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2017