Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Narrawa Road (south) (Rural Road) - 057040-15NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:May 2016 - Aug 2016
Australian Government Contribution:$43,073
Local Council/Shire:Warrumbungle Shire Council

Project Description

The surface of Narrawa Road – south, in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore, the existing surface becomes slippery during and after rainfall.

Overlay the surface of the entire length of Narrawa Road – south, with 100mm compacted road base material.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2016