Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jan 2016 - Feb 2016 |
Australian Government Contribution: | $600,000 |
Local Council/Shire: | Melbourne City Council (City of Melbourne) |
State: | VIC |
Project DescriptionThe existing asphalt road surface is oxidised with substantial longitudinal and transverse cracking and loss of cross-sectional shape with heavy rutting at the approach to intersections.
Proposed to cold plane profile the existing road surface to a depth of 50 millimetres for a length of 660 metres and a width of 15 metres and reinstate over the whole area with 10 mm type H hot mix asphalt wearing course to a depth of 50 mm. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2016