Jump to Content

Railway Parade, Boyup Brook - 057342-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Sep 2015 - Feb 2016
Australian Government Contribution:$118,034
Local Council/Shire:Shire of Boyup Brook
State:WA

Project Description

Abel Street, Bridge Street, Railway Parade and Connolly Streets all flood during rain events due to the existing piped street drainage being inadequate to carry the stormwater flows to the towns main drainage system

Upgrade stormwater lines that run from Abel Street, Bridge Street and Inglis Street to the Railway Parade Main Drain

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/04/2016