HAUGHTON ROAD, Clayton South - 057555-15VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2015 - May 2016
Australian Government Contribution:$1,088,535
Local Council/Shire:Kingston City Council
State:VIC

Project Description

Flexible road pavement is in poor condition and has failed for approximately 60% of the roads length; it has extensive cracking rutting and heaving failures. Kerb & channel is greater than 75% disjointed and requires replacing. Drainage improvements and traffic management works will be incorporated into this project.

Works involve road reconstruction and shared path construction, and consist of: • 9200m² of excavation for road pavement, shared path, footpaths and vehicle crossings, • 4750m² of asphalt pavement construction, • 4750m² of asphalt wearing course, • 1380m of concrete kerb & channel, • 930m² concrete footpath paving, • 200m² concrete vehicle crossings, • 2000m² concrete shared path, • 260m of drainage 225mm to 525mm Dia. Pipes • associated drainage pits

Total cost of proposed project is $1,167,063

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.