Jump to Content

First Avenue, Claremont, WA - 057566-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Feb 2016
Australian Government Contribution:$179,194
Local Council/Shire:Town of Claremont
State:WA

Project Description

Following 2012 assessment by Opus the road network was prioritised based on asphalt condition, cracking, patches, local surface defects, rutting and traffic counts. The list of roads were then inspected for deterioration since the survey. cost of annual maintenance and drainage problems. This road has potholes, edge failure, displaced kerb and cracking

Remove 40mm of seal, replace with new asphalt layer and new kerbing

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016