Forrest Street, Ardeer - 057616-15VIC-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Feb 2016
Australian Government Contribution:$319,985
Local Council/Shire:Brimbank City Council

Project Description

The existing road pavement exhibits areas of significant longitudinal and transverse cracking, isolated areas of failed pavement and patching. There is moderate roughness and loss of shape. In addition significant lengths of concrete kerbing are in a poor condition.

The project includes the following major aspects: • Rehabilitation of 455 metres of existing road pavement and resurfacing with asphalt • Reconstruction of 826 metres of existing kerb and channel • Construction of traffic islands at the intersection of North Street/Forrest Street and Tower Street/Forrest Street • Reconstruction of existing vehicle crossings where required • Reconstruction of all damaged footpath • Construction of 205 metres of underground drainage works

Total cost of proposed project is $503,314

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.