Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Dec 2015 - Dec 2016
Australian Government Contribution:$256,236
Local Council/Shire:Upper Hunter Shire Council
State:NSW

Project Description

This section of the street has inadequate storm water drainage, rough and uneven surface and failed kerb & guttering.

Reconstruction of failed pavement and replacement of kerb & guttering. Length of kerb & gutter to be replaced 300 metres. Length of road to be upgraded 0.00km to 0.260km (at Kingdon St) to 0.260km (at Kelly St). Width of road to be upgraded 12 metres (0.00km-0.13km) and 6 metres (0.13km-0.26km). Total area 2350m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/01/2017