Pirrinuan Malakoff Road (Rural Road) - 057688-15QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2016 - Apr 2016
Australian Government Contribution:$776,874
State:QLD

Project Description

The existing condition of the road has been rated as very poor. Based on road condition and the existing width of the sealed road being inadequate for the traffic volumes the above section of the Pirrinuan Malakoff Road has been scheduled for reconstruction.

Reconstructing a rural collector road to Councils current standards from 3.8km to 6.8km. Taking the road from a substandard 5.5m bitumen seal road with a condition rating of 9 out of 10 to a 8m wide bitumen seal with a 9 m formation. Some work was done on this road under the 2013 flood damage. This flood damage works highlights the bad condition of the rest of the road.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016