Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Mar 2016
Australian Government Contribution:$112,344
State:NT

Project Description

The road base no longer exists, with significant seal blow outs, sand dunes are encroaching the road, is full of pot holes and sand/dust, and poor drainage. The project will improve all weather access in the Numbulwar CBD, improve drainage and control localized flooding.

Install retaining wall works to prevent sand dunes encroaching the road will include remove access material and prepare surface, supply and install retaining wall, and backfill with sand. Earthworks to include reform road 100 x 6 metres wide, and install drain. Sealing works to include preparation of pavement, prime coat at 1.2L/m2, first seal coat at 1.6 L/m2, second seal coat at 1.2 L/m2, and supply and aplication of aggregate.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016