Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

George Street, Mount Evelyn - 057989-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Aug 2016 - Jun 2017
Australian Government Contribution:$84,202
State:VIC

Project Description

The existing road has a crushed rock formation requiring ongoing maintenance, with residents experiencing problems associated with dust, corrugations and potholes. The road services abutting urban residential properties. Construction of the existing unmade road will improve the amenity and quality of access for these properties.

Construction of the remaining unmade length of the road (185 metres). The width of the works will generally be 5.5metres, to match the existing road formation. The road will be constructed with an asphalt surface and kerb and channel and drainage to carry stormwater run-off. It is also proposed to incorporate water sensitive design elements within the project.

Total cost of proposed project is $206,700

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017