Department of Infrastructure and Regional Development print logo Building our Future print logo

Sunnyside Road, Gruyere - 058077-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Jun 2017
Australian Government Contribution:$594,070
State:VIC

Project Description

The existing bridge has an ageing steel beam and timber deck structure and forms a vital access link for the community. The existing bridge is too narrow for two way traffic, the speed zone is 80km/h and non-vehicular traffic is poorly catered for.

Replacement of the existing bridge structure with a new concrete construction, 8.5 metre wide with a 16 metre span, that will meet current day traffic loadings. Widening on road approaches to suit new bridge width. A pedestrian path will be provided on the bridge structure.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017