Yulu St, Pormpuraaw - 058087-15QLD-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Mar 2016
Australian Government Contribution:$222,815
State:QLD

Project Description

The Unsealed current road at the start of Yulu St & Pormpuraaw St Intersection is made from Sand & Shellgrit. The road along Yulu St and to the end of Yulu St has 5 home driveways and access is difficult because of the Sand & Shellgrit surface.The upgrade will allow safe driveways into residence homes along Yulu St. Yulu St which intersects with Pormpuraaw St, Qld. 4871

Re-surface with Gravel & Roadbase materials, build up, reshape & level existing road including excavation & pave the length of Yulu St at the intersection with Pormpuraaw St and all the way back to the end of Yulu St with 400 mm concrete edge restraint,3.9m paved pavement with .4m concrete edge restraint, 350m long & 4.7m wide using R2R 2015-2016 allocation of $484,250.00

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016