Project Description

Road surface has worn out losing its stones and bitumen binding and become rough and uneven affecting the ride ability on the road. Also the worn out road surface does not provide water proofing of the road pavement. Sections of kerb and gutter are cracked, crushed or lifted.

Replace the damaged kerb and gutter sections with new concrete kerb and gutter, repair weak areas and resurface the road with new asphalt concrete layer and install traffic control devices including line marking.

Total cost of proposed project is $30,011

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.