Jump to Content

Excelsior Road - 058296-15NSW-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Oct 2015
Australian Government Contribution:$286,963
Local Council/Shire:Parramatta City Council
State:NSW

Project Description

Road surface is affected by numerous cracks, potholes and other pavement defects. It is very rough to drive on. The surface looks old and oxidised.

The proposed work includes reconstruction of traffic lanes and resurfacing of the road with asphalt. Length = 360 m; Width = 10.6 m; Area = 3816 m2

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016