Bremer Valley Road, Callington, South Australia - 058838-15SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Mar 2017
Australian Government Contribution:$341,513
Local Council/Shire:Rural City of Murray Bridge
State:SA

Project Description

Bremer Valley Road provides a strategic route that links the areas of Harrogate ,Rockliegh and Monarto to the township of Callington and the South Eastern Freeway. It acts as a bus route that transports student to Callington, Nairne, Mount Barker and Murray Bridge. As it stand Bremer Valley Road is councils only Rural Link Road that does not meet the basic Levels of Service as detailed above. In its current form Bremer Valley Road is unsealed with a varying width ranging from 8.5m to 9.5m and over the last 5 years has required significant maintenance resulting in nearly 400 man and plant hours allocated to Patrol Grading. This equates to an annual plant and labour allocation of 80 hours (2 weeks) and a maintenance bill of nearly $15,000 per annum.

Rehabilitate and upgrade 3350m of the existing granular pavement by introducing an additional 150mm of limestone rubble. In addition, seal the upgraded pavement with a 14/7 spray to meet Rural City of Murray Bridge Rural Link Standards. This stage will complete the sealing of Bremer Valley Road

Total cost of proposed project is $506,871

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017