Department of Infrastructure and Regional Development print logo Building our Future print logo

Bakers Lane, Kemps Creek - 058963-15NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2015 - Feb 2016
Australian Government Contribution:$243,933
Local Council/Shire:Penrith City Council
State:NSW

Project Description

The road was originally constructed in 1980 and is already failed with numerous potholes and patching due to the increasing traffic and inadequate pavement materials

It is proposed to stabilise existing pavement to a depth of 250mm and to provide 30mm asphalt wearing surface for a length of 350 metres and a width of 10 metres.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016