Jump to Content

Clarendon Street - 059164-15VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2016 - Sep 2016
Australian Government Contribution:$200,000
Local Council/Shire:Central Goldfields Shire Council
State:VIC

Project Description

Clarendon Street is an Urban Collector road (85 metres long by 12.5 metres wide between kerbs) at the intersection with Tuaggra Street an Urban Collector road (10 metres long by 12 metres wide between kerbs) where the existing pavement is at the end of it life and is required to be reconstructed and resurfaced.

The existing pavement and kerb at the intersection and approaches are to be reconstructed providing narrowed kerb extensions, two raised pedestrian crossings, one raised speed hump in Clarendon Street and asphalt surfacing to the intersection to provide a level and safe environment for pedestrians and motorists.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016