Department of Infrastructure and Regional Development print logo Building our Future print logo

Crameri Road (rural road) - 059171-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Jun 2017
Australian Government Contribution:$150,090
Local Council/Shire:Central Goldfields Shire Council
State:VIC

Project Description

Crameri Road is a Rural Access 1 road in a rural residential environment where the existing road consists of 836 metres length of unsealed road, which is 7 metres wide, is continually deteriorated due to poor drainage and poor pavement materials.

The existing unsealed road is to be widened and strengthened with a deeper pavement, 7 metres wide and sealed to 4 metres wide.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017