Department of Infrastructure and Regional Development print logo Building our Future print logo

Possum Gully Road (rural road) - 059177-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Dec 2016
Australian Government Contribution:$200,000
Local Council/Shire:Central Goldfields Shire Council
State:VIC

Project Description

Possum Gully Road is a Rural Access 1 road in a rural residential environment where the existing road consists of 2000 metres length of unsealed road, which is 7 metres wide, is continually deteriorated and very dusty due to poor drainage and poor pavement materials.

The existing unsealed road pavement is to be re-profiled and re-sheeted with an unsealed wearing surface treatment, 6 metres wide.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017