Jump to Content

Melrose Drive, Wodonga, Vic, 3690 - 059352-15VIC-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Mar 2016 - Apr 2016
Australian Government Contribution:$90,000
Local Council/Shire:Wodonga City Council
State:VIC

Project Description

Road pavement shows significant areas of failure, including shoving, cracking and potholing. High maintenance costs associated with ongoing inspection and repair. Road safety associated with very slick pavement surface and shoved pavement.

Intersection reconstruction, including removal and replacement to 50mm depth of 2750 sqm of existing failed wearing surface. Pavement and/or subgrade replacement as required, Supply and place 50mm thick layer of type H 320 bitumen asphalt. Repaint linemarking.

Total cost of proposed project is $90,900

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/07/2016