Department of Infrastructure and Regional Development print logo Building our Future print logo

Ashburton Downs Road (Rural Road) - 059508-15WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Sep 2016
Australian Government Contribution:$539,716
Local Council/Shire:Shire of Meekatharra
State:WA

Project Description

The road has become corrugated over time and is also water worn. This has resulted in loss of road surface material. In addition, seven floodways in this section of road, wash out badly on each rain event.

Propose to reform and resheet 9m wide gravel surface and restore drainage for a total length of 20kms. Floodways will be reconstructed, including construction of cutoff walls where required.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016