Jump to Content

CORONATION Avenue, Campbelltown - 059529-15SA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jan 2016 - Feb 2016
Australian Government Contribution:$150,000
Local Council/Shire:Corporation of the City of Campbelltown
State:SA

Project Description

To address the structural integrity of the road pavement due to soil movement from very reactive soil and there are some drainage concerns. This road has a severe environmental deformation and cracking with moderate load induce cracking. Surface texture has a severe defect. Council's Pavement Management System has indicated that this road is warranted for total road reconstruction.

The work will involve a full road reconstruction by total excavation of road base and replacement with a deeper granular pavement to ensure the structure and integrity of the road from possible future soil movement. These work will involve replacing existing kerbs, driveway, traffic control and improving the drainage system. The road pavement being treated is 292m in length and 8m in width.

Total cost of proposed project is $226,101

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2016