Lower Hotham Road (rural road) - 059619-15WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2016 - May 2016
Australian Government Contribution:$78,288
Local Council/Shire:Shire of Boddington
State:WA

Project Description

The road (Lower Hotham - rural road) has several sections that are either cracked or rutted or have depressions or combinations of the same, which allows water to pond on the road surface which is dangerous to the driving public and further the water seeping into the road pavement generally leads to further road damage . The sections requiring repair are located between straight line kilometre 1.3 and straight line kilometre 10.1.

The corrective works involve the laying of a specialised asphalt layer to correct the depressions which impair the ride quality of the road and are a precursor to resealing as the road profile is restored to its original form as opposed to being deformed. These repairs will extend the life of those sections of the road and we can thus avoid expensive reconstruction work.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.