Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jan 2016 - May 2016 |
Australian Government Contribution: | $19,000 |
Local Council/Shire: | Mid-Western Regional Council |
State: | NSW |
Project DescriptionThe shoulder of the road is unsealed and there is no guttering or kerb in place. Stormwater drains towards this section of road, water backs up, causing minor flooding and scouring which washes away the loose gravel off the shoulder. These deposits also cause blockages in the stormwater drainage pipes. This is the only section of the road that has no sealed shoulder or kerbs present. There have been complaints and requests from the public to upgrade this section.
It is proposed that the kerb and gutter be extended for this section of Inglis Street, towards the intersection at Perry Street, so that it is consistent with the rest of the road. 100m of shoulder and 45m of kerb and gutter are required. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2016