Burnside Street, Deer park - 059900-15VIC-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2015 - Apr 2016
Australian Government Contribution:$430,643
Local Council/Shire:Brimbank City Council

Project Description

The existing road pavement exhibits significant oxidisation and ravelling, longitudinal and transverse cracking. There is significant longitudinal roughness. Significant lengths of concrete kerbing in a poor condition.

The project includes the following major aspects: • Rehabilitation of 368 metres of existing pavement and resurfacing with asphalt • Reconstruction of 680 metres of kerb and channel • Reconstruction of existing vehicle crossings where required • Construction of 3m wide share concrete path • Construction of red asphalt flattop road humps on the west side of the intersecting streets • Reconstruction of existing concrete footpath • Construction of new roundabout at the intersection with Christie Street • Construction of 33 metres of new drainage • Construction of 4 raingardens

Total cost of proposed project is $761,051

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/08/2016