Ralph Street, Sunshine West - 059903-15VIC-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2016 - Oct 2016
Australian Government Contribution:$192,193
Local Council/Shire:Brimbank City Council
State:VIC

Project Description

The existing road pavement exhibits areas of significant oxidisation and ravelling, linear and crocodile cracking. There is moderate longitudinal roughness. Significant lengths of concrete kerbing in a poor condition with displacement of channel /gutter.

The project includes the following major aspects: • Rehabilitation of 645 metres of existing road pavement and resurfacing with asphalt • Reconstruction of 1,106 metres of existing kerb and channel • Construction of 2 roundabouts and associated traffic islands • Reconstruction of existing vehicle crossings where required • Reconstruction of all damaged footpath • Construction of 424 metres of underground drainage works

Total cost of proposed project is $912,140

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2016