Jump to Content

Braemore Road Leonora - 060170-15WA-RTR

A A A

Funding Programme:Roads to Recovery Programme
Status:Completed
Transport Mode:Road
Expected Start/Finish:Feb 2016 - Apr 2016
Australian Government Contribution:$350,000
Local Council/Shire:Shire of Leonora
State:WA

Project Description

Movements of heavy vehicles including earthmoving equipment has resulted in ongoing maintenance issues where significant increase in maintenance grading has been required to maintain a suitable surface. Existing seal (0 straight line kilometres to 0.216 straight line kilometres) deteriorated. Dust has been an ongoing problem affecting nearby residents with these increased traffic movements. Two creek crossings present access issues in wet weather to nearby residents and heavy vehicles that frequent the road daily

The 1216m proposed for sealing will be reconstructed by way of consolidating existing formation, gravel resheeting, waterbinding and finished with seal, with kerbing works to first 216m where existing kerbing and seal exist. Two creek crossings will be concreted to allow/improve all weather access.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2016